The Eastern Gas Pipeline (EGP) is an example of Jemena's commitment to providing dependable and competitive gas transportation solutions. We aim to be leaders in reliability and availability.

The EGP is a key natural gas supply artery between gas fields in Gippsland in Victoria and the major gas markets in NSW and the ACT.

Gas transported on the EGP can be reliably delivered to:

- Sydney Short Term Trading Market (STTM) - via 4 delivery points
- Moomba-Sydney Pipeline at Wilton, for delivery to other East Coast markets further north
- Regional centres in Victoria and NSW
- ACT
- VicHub
- TGP, for delivery into Tasmania

The EGP can deliver into the Sydney STTM, with multiple independent delivery points providing increased security of supply for customers. This gives EGP customers the flexibility to redirect gas to a number of markets across the East Coast of Australia, and thus the ability to increase utilisation of their services and maximise their value.

Port Kembla Lateral Looping Project

Jemena has recently undertaken works to duplicate the existing Port Kembla lateral pipeline, which forms part of the EGP. A modification to Jemena’s EGP has been approved by the Department of Planning, Industry and Environment (DPIE). The modification is required to increase capacity to the EGP, to accommodate daily gas injection and maximum gas flows for the Port Kembla Gas Terminal Project, a separate project to be developed by Australian Industrial Energy (AIE). The approval can be viewed via the DPIE Planning Portal (https://www.planningportal.nsw.gov.au/major-projects/project/26196)

Access to the Tasmanian Gas Pipeline (TGP)

The EGP compresses all gas transported on the TGP at the TGP interconnection point.  Shippers injecting into the TGP interconnection point require a standard EGP transportation agreement and a TGP Transfer Service agreement.

We look forward to discussing your gas transportation requirements.

Contact Us

To discuss your gas transportation needs, please contact Courtney Fabian, Commercial Manager on (03) 9173 8006 or courtney.fabian@jemena.com.au.

Unless stated otherwise, information published on this page for the purposes of Division 2 Part 10 of the National Gas Rules was last updated on 21 June 2024, is current as of that date and replaces all previous versions.

Pipeline Information

 
Pipeline Class Transmission
Pipeline Map Click here for EGP Schematic map
Nameplate Rating

Click here for Nameplate Rating published on AEMO's website

TGP Transfer services:

  • up to 100 TJ/d
Construction Date August 2000 
Receipt Point(s) GBJV Longford, Orbost (Patricia Baleen), VicHub
Delivery Points Area 1: Bairnsdale (Lateral) - City Gate, Bairnsdale (Lateral) - Power Station
Area 2: Bombala, Cooma, Hoskinstown (ACT), Nowra
Area 3: Horsley Park (STTM), Wilton JGN (STTM), Port Kembla (STTM), Albion Park (STTM), Wilton MSP, Yallah (Tallawarra), Smithfield, Bomaderry, Shoalhaven Starches
Other: TGP Delivery Point, VicHub Delivery Point
Connected Facilities Click here for EGP Detailed Facility Information
Length 796.69km*
(*822.42km including laterals)
Pressure Under normal operating procedures between 3,000 kPa gauge and 16,550 kPa gauge
Compression 4 Solar Taurus turbine and compressor units at the Longford inlet
1 Solar Taurus turbine and compressor unit at East Gippsland, Mila, and Michelago Midline Compression Facilities
Gas Specification Click here for EGP Gas Specification
Measurement Manuals Click here for EGP Measurement Manual
Supplier Curtailment Methodology Click here for EGP Supplier Curtailment Methodology
Type of Gas Transported

Natural gas, or a blend of any primary gases which conforms to the applicable gas specification, subject to the following blending limits:*

  • hydrogen – nil
  • biomethane – no limit, provided the gas conforms with the applicable gas specification
  • synthetic methane – no limit, provided the gas conforms with the applicable gas specification

*Actual blending limit may vary depending on specific receipt and delivery point requirements.

Note that gas injected into the pipeline may be supplied from other pipelines which carry a co-mingled gas stream and may therefore potentially include gas blends. Any such gas blend must comply with Eastern Gas Pipeline's applicable gas specification.

Future Changes to Type of Gas Transported

The service provider is not currently aware that the type of gas transported through the Eastern Gas Pipeline is going to change in the future.

Pipeline Service Information

Pipeline Services Click here for EGP Transportation Services and Pricing Methodology

Service Usage Information

Historical monthly quantities of gas metered injected into and withdrawn from the pipeline and gas scheduled for injection into and withdrawal from the pipeline attributable to each pipeline service Click here for EGP service usage information  
Number of contracted customers as at the last day of the financial year 24

Service Availability Information

Information about matters expected to affect the capacity of the pipeline over the next 12 months 

Click here for AEMO Gas Bulletin Board Medium Term Capacity Outlook (Future)

An outlook for the firm capacity expected to be available for sale over the next 36 months 

Click here for the EGP available capacity outlook via the AEMO Gas Bulletin Board Uncontracted Capacity Outlook (Future)
*Firm Forward. Actual available capacity will vary depending on specific Receipt and Delivery Point requirements.

Information on any other limitations on the availability of pipeline services Relevant technical and operational requirements for access to this pipeline are referred to on this page. Jemena will provide you with any other information relevant to your access request. 

Standing Terms

Services and standing price methodology. This document also includes information about charging structures and other prices and charges applicable to each pipeline services. Click here for EGP Transportation Services and Pricing Methodology
Standing prices (reference transportation tariffs) Click here for EGP Tariff Schedule
Standard Terms and Conditions (GTA)

Click here for EGP Standard Terms & Conditions

Click here for the EGP - TGP Transfer Services Standard Terms & Conditions.

User Access Guide and Interconnection

User Access Guide Click here for Jemena - User Access Guide 
Access Request Form Access Request Form
Standard Connection Agreement Jemena - Template Interconnection Agreement
Standard Confidentiality Agreement for connection Jemena Template Confidentiality Agreement (Two Way) Interconnection

Financial information, historical demand information and cost allocation methodology

Financial Reporting Template

Financial reporting template for the EGP is available:

  • here for the twelve months from 1 January to 31 December 2019
  • here for the twelve months from 1 January to 31 December 2020
  • here for the twelve months from 1 January to 31 December 2021
  • here for the twelve months from 1 January to 31 December 2022
  • here for the twelve months from 1 January to 31 December 2023
Basis of Preparation

The basis of preparation used to prepare the financial reporting template for the EGP are available:

  • here for the twelve months from 1 January to 31 December 2019
  • here for the twelve months from 1 January to 31 December 2020
  • here for the twelve months from 1 January to 31 December 2021
  • here for the twelve months from 1 January to 31 December 2022
  • here for the twelve months from 1 January to 31 December 2023
Review and Audit Report

The review report providing assurance to Jemena over the financial reporting template for the EGP are available:

  • here for the twelve months from 1 January to 31 December 2019
  • here for the twelve months from 1 January to 31 December 2020
  • here for the twelve months from 1 January to 31 December 2021
  • here for the twelve months from 1 January to 31 December 2022
  • here for the twelve months from 1 January to 31 December 2023

The audit report providing assurance to Jemena over the financial reporting template for the EGP is available:

  • here for the twelve months from 1 January to 31 December 2019
  • here for the twelve months from 1 January to 31 December 2020
  • here for the twelve months from 1 January to 31 December 2021
  • here for the twelve months from 1 January to 31 December 2022
  • here for the twelve months from 1 January to 31 December 2023

Actual Prices Payable Information

Actual Prices Payable Click here for Actual Prices Payable data

Day ahead auction and capacity trading information

Operational Transport Service Agreement 

Click here for EGP OTSA version 2
Click here for EGP OTSA redline version
(version 1 dated 22 January 2019 vs version 2 dated 30 April 2020)

Click here for EGP OTSA version 1 (superseded)

Jemena Information about Operational Transportation Service Agreements Click here for Jemena Information about Operational Transportation Service Agreements
Standardisation Cost Charges Under Part 24 of the National Gas Rules, some costs incurred by a service provider relating to capacity trading and the day ahead auction (‘standardisation costs’) may be recoverable from transportation facility users.
Click here for Standardisation Cost Charge Information