The EGP is a key natural gas supply artery between gas fields in Gippsland in Victoria and the major gas markets in NSW and the ACT.
Gas transported on the EGP can be reliably delivered to:
- Sydney Short Term Trading Market (STTM) - via 4 delivery points
- Moomba-Sydney Pipeline at Wilton, for delivery to other East Coast markets further north
- Regional centres in Victoria and NSW
- ACT
- VicHub
- TGP, for delivery into Tasmania
The EGP can deliver into the Sydney STTM, with multiple independent delivery points providing increased security of supply for customers. This gives EGP customers the flexibility to redirect gas to a number of markets across the East Coast of Australia, and thus the ability to increase utilisation of their services and maximise their value.
Jemena has recently undertaken works to duplicate the existing Port Kembla lateral pipeline, which forms part of the EGP. A modification to Jemena’s EGP has been approved by the Department of Planning, Industry and Environment (DPIE). The modification is required to increase capacity to the EGP, to accommodate daily gas injection and maximum gas flows for the Port Kembla Gas Terminal Project, a separate project to be developed by Australian Industrial Energy (AIE). The approval can be viewed via the DPIE Planning Portal (https://www.planningportal.nsw.gov.au/major-projects/project/26196)
The EGP compresses all gas transported on the TGP at the TGP interconnection point. Shippers injecting into the TGP interconnection point require a standard EGP transportation agreement and a TGP Transfer Service agreement.
We look forward to discussing your gas transportation requirements.
To discuss your gas transportation needs, please contact Courtney Fabian, Commercial Manager on (03) 9173 8006 or courtney.fabian@jemena.com.au.
Unless stated otherwise, information published on this page for the purposes of Division 2 Part 10 of the National Gas Rules was last updated on 21 June 2024, is current as of that date and replaces all previous versions.
Pipeline Information |
|
Pipeline Class | Transmission |
Pipeline Map | Click here for EGP Schematic map |
Nameplate Rating |
Click here for Nameplate Rating published on AEMO's website TGP Transfer services:
|
Construction Date | August 2000 |
Receipt Point(s) | GBJV Longford, Orbost (Patricia Baleen), VicHub |
Delivery Points | Area 1: Bairnsdale (Lateral) - City Gate, Bairnsdale (Lateral) - Power Station Area 2: Bombala, Cooma, Hoskinstown (ACT), Nowra Area 3: Horsley Park (STTM), Wilton JGN (STTM), Port Kembla (STTM), Albion Park (STTM), Wilton MSP, Yallah (Tallawarra), Smithfield, Bomaderry, Shoalhaven Starches Other: TGP Delivery Point, VicHub Delivery Point |
Connected Facilities | Click here for EGP Detailed Facility Information |
Length | 796.69km* (*822.42km including laterals) |
Pressure | Under normal operating procedures between 3,000 kPa gauge and 16,550 kPa gauge |
Compression | 4 Solar Taurus turbine and compressor units at the Longford inlet 1 Solar Taurus turbine and compressor unit at East Gippsland, Mila, and Michelago Midline Compression Facilities |
Gas Specification | Click here for EGP Gas Specification |
Measurement Manuals | Click here for EGP Measurement Manual |
Supplier Curtailment Methodology | Click here for EGP Supplier Curtailment Methodology |
Type of Gas Transported |
Natural gas, or a blend of any primary gases which conforms to the applicable gas specification, subject to the following blending limits:*
*Actual blending limit may vary depending on specific receipt and delivery point requirements. Note that gas injected into the pipeline may be supplied from other pipelines which carry a co-mingled gas stream and may therefore potentially include gas blends. Any such gas blend must comply with Eastern Gas Pipeline's applicable gas specification. |
Future Changes to Type of Gas Transported |
The service provider is not currently aware that the type of gas transported through the Eastern Gas Pipeline is going to change in the future. |
Pipeline Service Information |
|
Pipeline Services | Click here for EGP Transportation Services and Pricing Methodology |
Service Usage Information |
|
Historical monthly quantities of gas metered injected into and withdrawn from the pipeline and gas scheduled for injection into and withdrawal from the pipeline attributable to each pipeline service | Click here for EGP service usage information |
Number of contracted customers as at the last day of the financial year | 24 |
Service Availability Information |
|
Information about matters expected to affect the capacity of the pipeline over the next 12 months |
Click here for AEMO Gas Bulletin Board Medium Term Capacity Outlook (Future) |
An outlook for the firm capacity expected to be available for sale over the next 36 months |
Click here for the EGP available capacity outlook via the AEMO Gas Bulletin Board Uncontracted Capacity Outlook (Future) |
Information on any other limitations on the availability of pipeline services | Relevant technical and operational requirements for access to this pipeline are referred to on this page. Jemena will provide you with any other information relevant to your access request. |
Standing Terms |
|
Services and standing price methodology. This document also includes information about charging structures and other prices and charges applicable to each pipeline services. | Click here for EGP Transportation Services and Pricing Methodology |
Standing prices (reference transportation tariffs) | Click here for EGP Tariff Schedule |
Standard Terms and Conditions (GTA) |
Click here for EGP Standard Terms & Conditions Click here for the EGP - TGP Transfer Services Standard Terms & Conditions. |
User Access Guide and Interconnection |
|
User Access Guide | Click here for Jemena - User Access Guide |
Access Request Form | Access Request Form |
Standard Connection Agreement | Jemena - Template Interconnection Agreement |
Standard Confidentiality Agreement for connection | Jemena Template Confidentiality Agreement (Two Way) Interconnection |
Financial information, historical demand information and cost allocation methodology |
|
Financial Reporting Template |
Financial reporting template for the EGP is available:
|
Basis of Preparation |
The basis of preparation used to prepare the financial reporting template for the EGP are available:
|
Review and Audit Report |
The review report providing assurance to Jemena over the financial reporting template for the EGP are available:
The audit report providing assurance to Jemena over the financial reporting template for the EGP is available:
|
Actual Prices Payable Information |
|
Actual Prices Payable | Click here for Actual Prices Payable data |
Day ahead auction and capacity trading information |
|
Operational Transport Service Agreement |
Click here for EGP OTSA version 2 Click here for EGP OTSA version 1 (superseded) |
Jemena Information about Operational Transportation Service Agreements | Click here for Jemena Information about Operational Transportation Service Agreements |
Standardisation Cost Charges | Under Part 24 of the National Gas Rules, some costs incurred by a service provider relating to capacity trading and the day ahead auction (‘standardisation costs’) may be recoverable from transportation facility users. Click here for Standardisation Cost Charge Information |