This Regulatory Investment Test for Distribution (RIT-D) arises because there is insufficient thermal capacity at Sunbury Zone Substation to supply the forecast load. In addition, the reliability, age and condition of the Sunbury Zone Substation assets is exposing customers to an increased loss of supply risk.
This document is Jemena’s draft project assessment report for the Sunbury Zone Substation. In accordance with the requirements of the National Electricity Rules this report describes:
This report includes the following economic assessment spreadsheet attachments:
All submissions and enquires relating to this draft project assessment report must be lodged with us on or before 10 March 2017.
This document is Jemena’s non-network options report for the Sunbury – Diggers Rest Growth Corridor, and is an initial step in our engagement with non-network proponents in addressing the identified need in relation to the Sunbury Zone Substation. Jemena welcomes an open dialogue with non-network proponents to ensure that the best solution is adopted, whether that solution is a network, non-network or combined project. In accordance with the requirements of the National Electricity Rules this report describes:
All submissions and enquiries relating to this non-network options report must be lodged on or before 29 January 2016.