This Regulatory Investment Test for Distribution (RIT-D) arises because there is insufficient thermal capacity in the Brunswick - Fairfield 22 kV subtransmission loop to supply the forecast load.
This document is Jemena’s Brunswick - Fairfield 22 kV subtransmission loop capacity constraint, and is an initial step in our engagement with non-network proponents in addressing the identified need in relation to the Brunswick - Fairfield subtransmission loop. Jemena welcomes an open dialogue with non-network proponents to ensure that the best solution is adopted, whether that solution is a network, non-network or combined project. In accordance with the requirements of the National Electricity Rules this report describes:
All submissions and enquiries relating to this non-network options report must be lodged on or before 15 December 2021.
This document is Jemena’s Brunswick - Fairfield 22 kV Subtransmission Loop Capacity Constraint – Draft Project Assessment Report. In accordance with the requirements of the National Electricity Rules this report describes:
All submissions and enquires relating to this draft project assessment report must be lodged with us on or before 20 October 2023.