Colongra Gas Transmission & Storage Pipeline

The Colongra Gas Transmission and Storage Pipeline was designed and built by Jemena to deliver gas to Snowy Hydro Limited's 667MW gas turbine facility near the existing Munmorah power station on the Central Coast of NSW. The pipeline not only transports gas to the power station but also stores enough gas to allow the power station to run at full capacity for five hours.

The Colongra pipeline includes 3.5 kilometres of 10 inch feeder pipeline, a 42 inch storage pipeline, a compressor station that increases gas pressure from 3.4MPa to 13MPa and a let-down station. It is the largest on-shore gas pipeline in Australia and is double looped to create nine kilometres of pipeline storage in a three kilometre stretch of land.

We look forward to discussing your gas transportation requirements.

Contact Us

To discuss your gas transportation needs, please contact Courtney Fabian, Commercial Manager on (03) 9173 8006 or courtney.fabian@jemena.com.au.

Unless stated otherwise, information published on this page for the purposes of Division 2 Part 10 of the National Gas Rules was last updated on 1 March 2024, is current as of that date and replaces all previous versions.

Pipeline Information

 
Pipeline Class Transmission
Pipeline Map

Click here for Colongra Gas Transmission and Storage Pipeline Schematic map

Nameplate Rating Click here for nameplate rating published on AEMO’s website
Construction Date March 2009 
Receipt Point(s) Munmorah Compressor Station
Delivery Points Munmorah Delivery Station
Connected Facilities Click here for Colongra Gas Transmission and Storage Pipeline connected facilities 
Length 9km *
(*13.23km including laterals)
Pressure 3.4 to 13.0 MPa
Compression 2 Ariel Reciprocating Compressors with Wauesha Gas Engines (one per compressor)
Gas Specification Refer to Colongra Standard form GTA (Schedule 1 and Schedule 3)

Pipeline Service Information

Pipeline Services Click here for Colongra Transportation Services and Pricing Methodology

Service Usage Information

Historical monthly quantities of gas metered injected into and withdrawn from the pipeline and gas scheduled for injection into and withdrawal from the pipeline attributable to each pipeline service Click here for Colongra service usage information
Number of contracted customers as at the last day of the financial year 1

Service Availability Information

Information about matters expected to affect the capacity of the pipeline over the next 12 months 

Click here for Medium Term Capacity Outlook (12 Month)

An outlook for the firm capacity expected to be available for sale over the next 36 months 

Click here Uncontracted Capacity Outlook (36 Months)

Information on any other limitations on the availability of pipeline services Relevant technical and operational requirements for access to this pipeline are referred to on this page. Jemena will provide you with any other information relevant to your access request. 

Standing Terms

Services and standing price methodology. This document also includes information about charging structures and other prices and charges applicable to each pipeline services. Click here for Colongra Transportation Services and Pricing Methodology
Standing prices (reference transportation tariffs) Click here for Colongra Tariff Schedule
Standard Terms and Conditions (GTA) Click here for Colongra Standard Terms and Conditions

User Access Guide and Interconnection

User Access Guide Click here for Jemena - User Access Guide 
Access Request Form Access Request Form
Standard Connection Agreement Jemena - Template Interconnection Agreement
Standard Confidentiality Agreement for connection Jemena Template Confidentiality Agreement (Two Way) Interconnection

Actual Prices Payable Information

Actual Prices Payable Click here for Actual Prices Payable data