Looking for a form, guide, map or diagram? Here’s where to find it.

Document centre

Search by ASSET or KEYWORDS using the panel on the right

Popular downloads

Negotiated connection contract process

Negotiated connection contract process

13 February 2015 | Jemena gas network | connection, process

Map of Rosehill Recycled Water Scheme Network

The Rosehill Recycled Water Scheme is an innovative recycled water project that will su...

16 February 2015 | Rosehill Recycled Water Scheme | aquanet

Queensland Gas Pipeline Operational information

Operations and meaurement manual

18 February 2015 | Queensland Gas Pipeline | measurement, operation

Queensland Gas Pipeline Tariff schedule

Tariff schedule

18 February 2015 | Queensland gas pipeline | schedule

Colongra Gas Transmission and Storage Pipeline Map

The Colongra gas transmission and storage pipeline was designed and built by Jemena to ...

18 February 2015 | Colongra Gas Transmission and Storage Pipeline |

Demand side engagement

Managing supply and demand is key to ensuring that Jemena Electricity Networks is plann...

19 February 2015 | Jemena electricity network | demand

Eastern Gas Pipeline Capacity

Jemena is currently aggregating loads for an expansion of the Eastern Gas Pipeline with...

20 February 2015 | Eastern Gas Pipeline | capacity

Connecting to Queensland Gas Pipeline

We are open to discussing capacity requests by current or potential customers

23 February 2015 | Queensland Gas Pipeline | connection