Negotiated connection contract process
Negotiated connection contract process
13 February 2015 | Jemena gas network | connection, process
Map of Rosehill Recycled Water Scheme Network
The Rosehill Recycled Water Scheme is an innovative recycled water project that will su...
16 February 2015 | Rosehill Recycled Water Scheme | aquanet
Queensland Gas Pipeline Operational information
Operations and meaurement manual
18 February 2015 | Queensland Gas Pipeline | measurement, operation
Queensland Gas Pipeline Tariff schedule
Tariff schedule
18 February 2015 | Queensland gas pipeline | schedule
Colongra Gas Transmission and Storage Pipeline Map
The Colongra gas transmission and storage pipeline was designed and built by Jemena to ...
18 February 2015 | Colongra Gas Transmission and Storage Pipeline |
Demand side engagement
Managing supply and demand is key to ensuring that Jemena Electricity Networks is plann...
19 February 2015 | Jemena electricity network | demand
Eastern Gas Pipeline Capacity
Jemena is currently aggregating loads for an expansion of the Eastern Gas Pipeline with...
20 February 2015 | Eastern Gas Pipeline | capacity
Connecting to Queensland Gas Pipeline
We are open to discussing capacity requests by current or potential customers
23 February 2015 | Queensland Gas Pipeline | connection