Are you ready to connect to gas?

Preparing your site for a new gas connection

Access

The site must allow clear access for field crews to be able to complete work on site.

Markings 

Site to be clearly marked with identification for our crews to be able to locate e.g. Lot number/House number 

Location

Proposed gas meter location must be identified as per distributor's requirements. Meter location must be accessible for reading and maintenance (e.g. not behind a gate). The meter must be protected if proposed location is within 1 metre of vehicle traffic.

Clean and clear

The site must be clean and clear for our crews to be able to safely complete works.

New builds 

Build must be at lock up stage, and proposed gas meter location and street should be clear from:  

      • Scaffolding or temporary fencing  
      • Rubbish or building materials 
      • Skip bins and toilets 
      • Machinery 

Existing homes 

Similarly, we require unobstructed access to the proposed gas meter location and its’ direct line from the street.  

Is your site ready? 

Gas connection timeframes