Skip to main
jemena logo

Atlas Gas Pipeline

The Atlas Gas Pipeline (Atlas) was designed and constructed by Jemena to transport gas from Senex Energy’s Atlas block in the Surat Basin to Wallumbilla, via Jemena’s Darling Downs Pipeline (DDP). 

The Atlas acreage was the first domestic gas tender issued by the Queensland Government intended to increase supply of gas and help provide energy security for businesses and households on Australia’s east coast. Jemena built the facility to process and transport Senex gas to the domestic market.  The Atlas Pipeline is a single user facility.

We look forward to discussing your gas transportation requirements.  

Contact Us

To discuss your gas transportation needs, please contact Brad Evans, Commercial Manager on 0408 869 908 or atlas.ddp.commercial@jemena.com.au.

Unless stated otherwise, information published on this page for the purposes of Division 2 Part 10 of the National Gas Rules was last updated on 22 December 2023, is current as of that date and replaces all previous versions.

Pipeline Information  
Pipline Class Transmission
Pipeline Map Click here for Atlas schematic map
Nameplate rating 52.1 TJ
Construction date November 2019
Receipt Point(s) Atlas Gas Processing Facility
Delivery Points Atlas to DDP Delivery point
Connected Facilities Click here for Atlas Detailed Connected Facility Information
Length 60.56km
Pressure Under normal operations procedures between 13,800 and 14,500kPa
Compression There are no Service Provider-operated compressor facilities
Gas Specification Click here for Atlas Gas Specification.pdf
Measurement Manuals Click here for Atlas Measurement Manual
Supplier Curtailment Methodology Click here for Atlas Supplier Curtailment Methodology

Type of Gas Transported

Natural gas, or a blend of any primary gases which conforms to the applicable gas specification, subject to the following blending limits:*

  • hydrogen – nil
  • biomethane – no limit, provided the gas conforms with the applicable gas specification
  • synthetic methane – no limit, provided the gas conforms with the applicable gas specification

 

*Actual blending limit may vary depending on specific receipt and delivery point requirements.

 

Note that gas injected into the pipeline may be supplied from other pipelines which carry a co-mingled gas stream and may therefore potentially include gas blends. Any such gas blend must comply with Atlas Gas Pipeline applicable gas specification.  
Future Changes to Type of Gas Transported The service provider is not currently aware that the type of gas transported through the Atlas Gas Pipeline is going to change in the future.  

Pipeline Service Information

Pipeline services Click here for Atlas Transportation Services

Service Usage Information

Historical monthly quantities of gas metered injected into and withdrawn from the pipeline and gas scheduled for injection into and withdrawal from the pipeline attributable to each pipeline service Click here for Atlas pipeline service usage information
Number of contracted customers as at the last day of the financial year 1

Service Availability Information

Information about matters expected to affect the capacity of the pipeline over the next 12 months  Click here for 12 Month Capacity Outlook (Future)
An outlook for the firm capacity expected to be available for sale over the next 36 months  Click here for 36 Month Uncontracted Capacity Outlook
Information on any other limitations on the availability of pipeline services Relevant technical and operational requirements for access to this pipeline are referred to on this page. Jemena will provide you with any other information relevant to your access request.

Standing Terms

Services and standing price methodology. This document also includes information about charging structures and other prices and charges applicable to each pipeline services. Click here for Atlas Transportation Services and Pricing Methodology
Standing prices (reference transportation tariffs) Click here for Atlas Gas Pipeline Tariffs - 1 Jan 2024.pdf
Standard Terms and Conditions (GTA) Click here for Atlas Standard Terms and Conditions

User Access Guide and Interconnection

User Access Guide Click here for Jemena - User Access Guide
Access Request Form Access Request Form
Standard Connection Agreement Jemena - Template Interconnection Agreement
Standard Confidentiality Agreement for connection Jemena Template Confidentiality Agreement (Two Way) Interconnection

Actual Prices Payable Information

Actual Prices Payable Click here for Actual Prices Payable