What is Embedded Generation? 

Embedded Generation (EG) involves any form of onsite generation installed on your premise, which may require a connection to the Jemena Electricity Distribution Network. 

Types of Embedded Generation include:   

Inverter Energy Systems (IES):   

  • Solar Photovoltaic Systems. 
  • Battery Storage (when exporting to the network). 
  • Wind generators. 

Non-IES (rotating):  

  • Synchronous machine (Diesel generators, Gas generators). 
  • Induction machine.  

All generation systems that require an connection to the Distribution Network must be reviewed and approved by Jemena prior to connection and operation. This is to ensure safe and compliant operation of the Jemena network. 

 

Victoria Emergency Backstop Mechanism

The Victorian Government is introducing an Emergency Backstop Mechanism (EBM) for inverter-based photovoltaic Embedded Generation systems. This Mechanism requires Jemena to switch off or curtail Photovoltaic Systems exporting to the Distribution Network when instructed to do so by the Australian Energy Market Operator (AEMO). Stage 1 of the EBM was implemented in October 2023 and requires all new, replacement and upgraded applications for Photovoltaic Systems with a generating capacity greater than 200kVA (~200kW- large systems) to be equipped with remote disconnection capability. 

Stage 2 will come into effect on 1 October 2024 and extends the above requirement to all new, replacement and upgraded systems with a generating capacity between 0kVa to 200kVA (small to medium size systems). Learn more about the Emergency Backstop Mechanism here.

New and alteration of existing Embedded Generation applications:  

From 1 October 2024, all customers, installers and electrical contractors are required to: 

  1. Ensure any new or upgraded installation is compliant with the new Guideline.
  2. Submit all new and alteration of existing Embedded Generation applications on the Jemena ‘Connect and manage my electricity’ portal. Please select ‘Approve My Generation or Battery Storage’.
  3. Provide additional information during the application and commissioning process as requested by Jemena staff. The following checklist will provide a guide of information typically required in the application.  
DER Installation Fields  Alternating Current (AC) Connection Fields Distributed Energy Resources (DER) Device Fields  Commissioning and connection fields (For inverter systems - new form within the portal) 
Aggregated Approved Capacity (kVA)  Number of AC Connections  Number of DER Devices  NMI (National Metering Identifier) 
Installer Identification  AC Equipment Type  Device Type  LFDI (Long Form Device Identifier- about 40 characters)
Number of Phases Available  Inverter/Small Generating Unit Manufacturer  Device Sub Type  PIN (6-digit device pin)
Number of Phases with DER installed  Inverter Model Number  Manufacturer  Photos of inverter settings 
Does the inverter have voltage response modes (Volt-Var & Volt-Watt)?  Inverter Series  Model Number 

Other Requirements: 

  1. Inverter set to Aust Region A 
  2. Low static export limit applied
  3. Confirm internet connection (Y/N)
Comments  Serial Number     
National Meter Identification Number       

 

Things you should know: 

All new installations and upgrades to existing Installations must be compliant with the requirements of the Technical Rules, AS/NZS 4777.1, 4777.2, AS/NZS 3000, and other relevant Standards, Laws and Good Industry Practice. Applicants must be pre-approved by Jemena before installing any devices at the premise intended to be connected to the Jemena Distribution Network.

 

How much will it cost? 

Jemena will apply a connection charge to cover the costs and time for our team to assess your application.  

From time to time, we may be required to augment our network to facilitate your Embedded Generation system. Our team will contact you if we do need to make any augmentation and advise of any associated costs.  

 

Embedded Generation Connection Charges 

Total On-Site Embedded Generation Type/ Size  Connection Service  Connection charges (excluding GST) *Note 

Inverter Energy System
(Up to 10 kVA per phase or 30 kVA 3-phase) 

Basic Connection Service  Basic Connection fee (meter reconfiguration) 

Inverter Energy System
Solar PV (up to 10 kVA per phase or 30 kVA 3-phase)
plus Battery Energy Storage System (BESS)
(up to 10 kVA per phase or 30 kVA 3-phase) 

Negotiated Connection Service 


see table below for detailed solar

& battery installation

Inverter Energy System 
(>30 kVA to 200 kVA) 

Negotiated Connection Service 

see table below for detailed solar

& battery installation

Inverter Energy System 
(>200 kVA to 500 kVA) 

Negotiated Connection Service  $3,360 

Non- Inverter Energy System
(up to 30 kVA) 

Negotiated Connection Service  $3,360 

Non- Inverter Energy System 
(>30 kVA to 200 kVA) 

Negotiated Connection Service  $3,960 

Non- Inverter Energy System 
(>200 kVA to 500 kVA) 

Negotiated Connection Service  $4,560 

Inverter Energy System OR Non-Inverter Energy System
(>500 kVA to 1,500 kVA) 

Negotiated Connection Service  $7,740 

Inverter Energy System OR Non-Inverter Energy System
(>1,500 kVA to 5,000 kVA) 

Negotiated Connection Service  $13,980 
* Note: for all negotiated connection services, further connection charges will apply. 

Connection Charge for Sites with an Inverter Energy System 

Total Solar Inverter Install Total Battery Inverter Install Central Protection Process Approx Fees  Conditions
10 kVA or less per phase  - Not Required Basic $0 Maximum export 5kVA 
5 kVA or less per phase 5 kVA or less per phase Not Required Basic $0  Maximum export 5kVA 
10 kVA or less per phase  10 kVA or less per phase  Not Required Negotiated ~$550 Maximum export 5kVA 
5 kVA or less per phase  6-10 kVA per phase  Not Required Negotiated ~$550 Maximum export 5kVA 
>10 kVA per phase  - Required Negotiated ~$2280+ As per assessment
>10 kVA per phase  Any battery size  Required Negotiated ~$2280+ As per assessment
10 kVA or less per phase  >10 kVA per phase  Required Negotiated ~$2280+ As per assessment
30 kVA or less (3phase)  - Not Required Basic $0 Maximum export 15kVA 
Aggregate Solar + Battery 30 kVA or less (3phase)    Not Required Basic $0 Maximum export 15kVA 

Solar <30 kVA + Battery  

total aggregate solar + battery 40 kVA or less (3phase) 

  Not Required Negotiated ~$550 Maximum export 15kVA 
Solar 30 kVA + Battery 10 kVA or less (3phase)    Not Required Negotiated ~$550 Maximum export 15kVA 
Solar 30 kVA + Battery >10 kVA (3phase)    Required Negotiated ~$2280+ As per assessment

Solar<30 kVA + Battery 

total aggregate of solar + battery >40 kVA (3phase) 

  Required Negotiated ~$2280+ As per assessment
Solar >30 kVA + Battery (Any kVA   Required Negotiated ~$2280+ As per assessment