Guide for medium-density and high-rise connections
This page lists the various documents that have been prepared to assist developers, arc...
23 June 2015 | Jemena Gas Network | centralised hot water, common factors, medium density, metering
Application forms
Application forms
22 June 2015 | Jemena Gas Network | application, connection
Connection contracts
Connection contracts
22 June 2015 | Jemena Gas Network | connection, contracts
Ancillary Charge Listing (T2125)
In NSW/ACT the Distributor must make available in an electronic form a remotely accesse...
10 November 2015 | Jemena Gas Network | Ancillary, charges
Technical drawings
Our standard design is set out in our technical drawings.
25 April 2016 | Jemena Gas Network |
Deemed standard connection contract
Deemed standard connection contract
08 March 2018 | Jemena Gas Network | connection, contracts
Network Operator Rules
Network operator rules
10 June 2015 | Jemena Gas Network |
Average gas consumption
Jemena is committed to sharing information and educating our community
20 January 2015 | Jemena gas network | consumption
Access arrangement
In June 2015, the Australian Energy Regulator made the access arrangement that applies ...
20 January 2015 | Jemena gas network | access arrangement, charges, tariffs
Negotiated connection contract process
Negotiated connection contract process
13 February 2015 | Jemena gas network | connection, process