Looking for a form, guide, map or diagram? Here’s where to find it.

Document centre

Search by ASSET or KEYWORDS using the panel on the right

Popular downloads

Customer connection guide

This guideline is provided to assist customers to understand their rights and obligatio...

26 August 2015 | Jemena Electricity Network | connection

Network Operator Rules

Network Operator Rules

30 December 2019 | Jemena Gas Network |

Guide for medium-density and high-rise connections

This page lists the various documents that have been prepared to assist developers, arc...

09 April 2020 | Jemena Gas Network | centralised hot water, common factors, medium density, metering

Gas Connection contracts

Connection contracts - including Model Standing Offer

24 November 2020 | Jemena Gas Network | connection, contracts, model, offer, standing

Deemed Standard Distribution Contract

Deemed Standard Distribution Contract

19 October 2015 | Jemena Electricity Network | contracts, distribution, Electricity

Ancillary Charge Listing (T2125)

In NSW/ACT the Distributor must make available in an electronic form a remotely accesse...

15 June 2021 | Jemena Gas Network | Ancillary, charges

Technical drawings

Our standard design is set out in our technical drawings.

01 May 2016 | Jemena Gas Network |

Application Forms

Application forms for connecting and managing your electricity connection with Jemena

01 July 2016 | Jemena Electricity Network | application, connection, Electricity

Model Standing Offer - Electricity

This model standing offer applies to applications for basic connection services lodged ...

24 November 2020 | Jemena Electricity Network | connection, Electricity, model standing offer

Micro-embedded generators

Inverter connected generators (usually solar).

14 February 2018 | |