Jemena is currently aggregating loads for an expansion of the Eastern Gas Pipeline with the addition of two new compressors. This stage of expansion will increase the Eastern Gas Pipeline’s capacity from 106 PJ/a to 130 PJ/a. There is also the capability to loop the pipeline in the future should demand exceed the expansion plans that are under consideration.
Capacity for Firm Forward Haulage and As Available Forward Haulage is subject to technical assessment at the required receipt and delivery points. Backhaul capacity varies on a daily basis and is also subject to technical assessment at the required receipt and delivery point.