Network Operator Rules
Network Operator Rules
30 December 2019 | Jemena Gas Network |
Guide for medium-density and high-rise connections
This page lists the various documents that have been prepared to assist developers, arc...
09 April 2020 | Jemena Gas Network | centralised hot water, common factors, medium density, metering
Gas Application forms
Application forms for the Jemena Gas Network
19 July 2021 | Jemena Gas Network | application, connection
Gas Connection contracts
Connection contracts
- including Model Standing Offer
24 November 2020 | Jemena Gas Network | connection, contracts, model, offer, standing
Technical drawings
Our standard design is set out in our technical drawings.
01 May 2016 | Jemena Gas Network |
Deemed standard connection contract
Deemed standard connection contract
08 March 2018 | Jemena Gas Network | connection, contracts
Ancillary Charge Listing (T2125)
In NSW/ACT the Distributor must make available in an electronic form a remotely accesse...
17 June 2022 | Jemena Gas Network | Ancillary, charges
Negotiated connection contract process
Negotiated connection contract process
29 June 2015 | Jemena gas network | connection, process
Average gas consumption
Jemena is committed to sharing information and educating our community
20 June 2022 | Jemena gas network | consumption