Guidelines for embedded generation

These guidelines have been prepared to assist proponents or their agents connect embedded generators to the Jemena Electricity Network.

It is not expected that this document will be read from cover to cover but rather it shall be used as a reference during all stages of an embedded generation design and installation project. Nonetheless all embedded generators connected to the DNSP network are expected to fully comply with the standards covered in chapters 5, 6 and 7 and therefore these sections should be reviewed in detail as part of every design.